SFS Architecture and Water Technologies designed the original Sar-Ko-Par Aquatic Center in 1998. While it served the community well, Lenexa's needs and aquatic opportunities had evolved, and the facility was ready for upgrades. Following an aquatics study in 2019, the project team designed an updated Center with a 25-meter competition pool and dive well, 40-foot slide tower with two slides, 480-foot lazy river with action channel, and zero-depth entry pool with play structure. Improvements to the site include expanded parking and drop-off areas.
SFS designed a new entry breezeway and administration building for the Center. In addition, city dollars were maximized to fund new aquatic amenities by refreshing rather than replacing several existing structures, including the bathhouse, concessions, two mechanical buildings and shade structures.
Our Team
-
Kerry Newman
Senior Principal
-
Brian Garvey
Principal Architect
-
Allison Vandever
Senior Project Manager
-
Zach Bodine
Senior Project Architect
-
Derek McMurray
Senior Designer
-
Isaac Taylor
Project Architect
-
Kevin Hartman
Interior Design Intern
Our Services
- Concept Design
- Architectural Design
- Interior Design
- Construction Administration