Skip to content
Homepage

Kirksville Aquatic Center

Kirksville, Missouri

The SFS and Water’s Edge team completed design and construction documents to renovate Kirkville’s existing aquatic complex and create a new bathhouse. The outdoor leisure and lap pool was heavily modified to include six 25-yard lap lanes, a zero-depth entry with new play features, a lazy river and family slide. New amenities include a dual flume slide tower with deck runouts, deck sprays, night swim lighting, shade structures and birthday party rental areas on deck. Improvements to the indoor facility include a shallow play area and current channel with four 25-yard lap lanes. The existing 6,600 square foot indoor pool enclosure was renovated with new translucent daylighting panels and expanded for additional indoor deck seating. A new 7,600 square foot bathhouse provides party and meeting rooms, concessions, changing rooms and administrative offices.

Our Team

  • Kerry Newman

    Kerry Newman

    Senior Principal

  • Brian Garvey

    Brian Garvey

    Principal Architect

  • Zach Bodine

    Zach Bodine

    Senior Project Architect

  • Kelsey Mahoney

    Kelsey Mahoney

    Senior Interior Designer

  • Bonnie Limbird

    Bonnie Limbird

    Senior Interior Designer

Our Services

  • Facility Assessment
  • Feasibility Study
  • Concept Design
  • Community Engagement
  • Architectural Design
  • Interior Design
  • FF&E Design & Procurement